Vietnamese
Search Engine

Latest News
Groundwater extraction may drown mega-delta
Vietnam Energy Outlook Report 2019
Severe Drought Tightens Pressure in Mekong River Basin
Joint Research on Mekong Water Resources Management
Status and prospective of dam safety management in Vietnam
Sun on the Great Lake Can Save the Mekong?
Cambodia, Laos, Thailand and Vietnam to face severe drought
Impacts of climate change on floods and urban flooding management.
Mekong dying: China wants more than just electricity from dams
Damming the Mekong Basin to environmental hell
The advent of Geomembrane Faced Earth and Rock Dams (GFRD)
The Global Earthquake Model (GEM)
Water resources in Vietnam: current status and challenges
Diagnosis of Songloulou Dam: Innovative stress measurement on concrete abutment
Anthropogenic stresses on the world’s big rivers
Seismic design and performance criteria for large dams and methods of dynamic analysis
The Fourth Congress of The VNCOLD
WWF-Vietnam: Vacancy announcement
Geologist for dams sought !!(VERY URGENT!)
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Dams in Vietnam
Send this article

Hoa Binh Dam.
-
    

Hoa Binh Dam

 

 



Introduction

 

Hoa Binh hydropower plant,  whose capacity is the biggest in the South East Asia,  was constructed from 1979 to April 1994 in Hoa Binh Province in the North Viet Nam. It covers 1/3 production of electricity of  the country.

 

Dam’s duties:

 

-         Flood Mitigation

-         Generation of Electricity

-         Irrigation Sources

-         Water Supply

-         Navigation

 



Main  parameters:

 

-         Length of dam: 734m

-         Height of dam: 128m

-         Optimum elevated water level: 120m

-         Volume of water storage: 9 billion m3

-         Generation machine: 8 units

-         Design capacity: 1920 MW

-         Type of dam: Clay core-wall rockfill dam

-         Concrete volume: 1,899,000 m3

-         Grouting : 205,000 m

-         Mechanical installation: 46,721 tons./.


 

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To