Vietnamese
Search Engine

Latest News
Geologist for dams sought !!(VERY URGENT!)
Vietnam, Corée, Taiwan : comment sortir du nucléaire et en même temps du charbon ?
Outlook for the Offshore Wind Industry in Vietnam
Global hydropower growth strong in 2017, according to IHA's most recent survey
Vacancy announcement :(1) Project Manager; (2) Project Officer, WWF-Vietnam
Latest Trends and Technologies in Civil Engineering within Asia
All Eyes on Lao Dam Tragedy Probe
ACECC Outlook No.12
Press Release | Pak Lay Dam Proceeding – Another Expensive Distraction
The Sambor Dam Is a Tragic Mistake for Cambodia
Kenyan dam bursts causing 'huge destruction' and deaths
Brief on Governance of the Low Hazard Small Dams (LHSD)
Hydro-Politics in the Mekong basin
Low Hazard Small Dams
Development of National Disaster Management Plan of Vietnam
The Diversion Works for the Cua Dat CFRD in Vietnam
Welcome address to “ASIA 2018” conference in Da Nang – VIETNAM 13-15 March 2018
Au Vietnam, la montée des eaux crée un choc des cultures
Climate change is triggering a migrant crisis in Vietnam
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Dams in Vietnam
Send this article

Ke Go Reservoir.
-

Ke Go Reservoir

Location

Ke Go Reservoir is in Cam My commune, Cam Xuyen district, Ha Tinh province, 70 km from Vinh city in the south.




Salient parameters:

Reservoir length:                   29km

Reservoir area:                     over 30 km2

Effective storage capacity: 345 x 106 m3

Total storage capacity:         425 x 106 m3.

Catchment area:                   223 km2

Homogeneous earthfill dam: 37.4m high, 970m long together with 3 other auxiliary dams and 3 spillways (including Doc Mieu spillway, intake spillway and emergency spillway).

Main canal: over 10m wide, 17.2 km long, discharge of 28.2 m3/s; branch canal system is 110 km long.

 



Reservoir’s duties:

To irrigate 21,136 ha of cultivated land of Cam Xuyen, Thach Ha districts and Ha Tinh town.

To protect the downstream area against flash flood and erosion

To supply water for industry and living with discharge of 1.6m3/s

To generate electricity with installed capacity of 2.3 MW.

At present, the World Bank supports the Project: “Vietnam Water Resources Assistance Project” to strengthen, upgrade and modernize several irrigation systems including Ke Go.


(Pham Thu Huyen - VNCOLD)

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To