Vietnamese
Search Engine

Latest News
Groundwater extraction may drown mega-delta
Vietnam Energy Outlook Report 2019
Severe Drought Tightens Pressure in Mekong River Basin
Joint Research on Mekong Water Resources Management
Status and prospective of dam safety management in Vietnam
Sun on the Great Lake Can Save the Mekong?
Cambodia, Laos, Thailand and Vietnam to face severe drought
Impacts of climate change on floods and urban flooding management.
Mekong dying: China wants more than just electricity from dams
Damming the Mekong Basin to environmental hell
The advent of Geomembrane Faced Earth and Rock Dams (GFRD)
The Global Earthquake Model (GEM)
Water resources in Vietnam: current status and challenges
Diagnosis of Songloulou Dam: Innovative stress measurement on concrete abutment
Anthropogenic stresses on the world’s big rivers
Seismic design and performance criteria for large dams and methods of dynamic analysis
The Fourth Congress of The VNCOLD
WWF-Vietnam: Vacancy announcement
Geologist for dams sought !!(VERY URGENT!)
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Dams in Vietnam
Send this article

Thac Ba Hydropower Plant.
Thac Ba Hydropower Plant is constructed on Chay River in Yen Binh district, Yen Bai province. This is the first hydropower plant of Vietnam which was assisted by the former USSR, now is the Republic of Russia

 

Thac Ba Hydropower Plant




Thac Ba Hydropower Plant is constructed on Chay River in Yen Binh district, Yen Bai province. This is the first hydropower plant of Vietnam which was assisted by the former USSR, now is the Republic of Russia.






The plant was commenced on August 19th 1964 and inaugurated on October 5th 1971.
The first unit was commissioned on October 5th 1971.

The second and third units were commissioned on March 10th 1972 and May 19th 1972, respectively.




Salient parameters of the plant are as follows:

- Catchment area:  6,430km2

- Installed capacity: 120MW.

- Maximum height of dam:  48m.
- Dam length: 657m.
- Dam volume: 1.33 million m3.
- Effective storage capacity of the reservoir: 2,160,000,000 m3.
- Total storage capacity of the reservoir: 2,490,000,000 m3.
- Reservoir surface area corresponding to normal water level: 235km2.
- Maximum length of the reservoir: 60km.
- Normal water level: +58.0
- Flood water level 0.01%: +61.0
- Flood water level 0.1%: +59.65
- Flood water level 1%: +58.85
- Dead water level: +46.0
- Water level prior to flood: +50.3
- Maximum flood release capacity: 3,650m3/s.

- Average electricity output: 400 million kWh/year.




(Thu Huyen - www.vncold.vn)

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To