Vietnamese
Search Engine

Latest News
Groundwater extraction may drown mega-delta
Vietnam Energy Outlook Report 2019
Severe Drought Tightens Pressure in Mekong River Basin
Joint Research on Mekong Water Resources Management
Status and prospective of dam safety management in Vietnam
Sun on the Great Lake Can Save the Mekong?
Cambodia, Laos, Thailand and Vietnam to face severe drought
Impacts of climate change on floods and urban flooding management.
Mekong dying: China wants more than just electricity from dams
Damming the Mekong Basin to environmental hell
The advent of Geomembrane Faced Earth and Rock Dams (GFRD)
The Global Earthquake Model (GEM)
Water resources in Vietnam: current status and challenges
Diagnosis of Songloulou Dam: Innovative stress measurement on concrete abutment
Anthropogenic stresses on the world’s big rivers
Seismic design and performance criteria for large dams and methods of dynamic analysis
The Fourth Congress of The VNCOLD
WWF-Vietnam: Vacancy announcement
Geologist for dams sought !!(VERY URGENT!)
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Documents
Send this article

Hydropower development in the lower Mekong basin (LMB)
Over 30,000 MW in LMB (13,000 MW in Lao PDR, 13,000 MW on mainstream and remaining in Cambodia, Viet Nam and Thailand).

In the Mekong Delta (South Vietnam)

HYDROPOWER DEVELOPMENT
IN THE LOWER MEKONG BASIN (LMB)

Dr. Nguyen Duc Lien, Senior Consultant, MRC

                       Dr. Dao Trong Tu, Deputy Secretary General, VNMC

Mekong is one of the world large rivers with Huge Hydropower Potential:

- Over 30,000 MW in LMB (13,000 MW in Lao PDR, 13,000 MW on mainstream and remaining in Cambodia, Viet Nam and Thailand). 

-  Only 7% developed to date and several projects with over 2,000 MW are under construction and/or investigation

-  23,000 MW in Upper Mekong or Lancang River in Yunnan.  About 13% developed and Xiaowan of 4,200 MW is under construction.

 

Please see in much detail (PDF; 614KB) 

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To