Vietnamese
Search Engine

Latest News
Latest Trends and Technologies in Civil Engineering within Asia
All Eyes on Lao Dam Tragedy Probe
ACECC Outlook No.12
Press Release | Pak Lay Dam Proceeding – Another Expensive Distraction
The Sambor Dam Is a Tragic Mistake for Cambodia
Kenyan dam bursts causing 'huge destruction' and deaths
Brief on Governance of the Low Hazard Small Dams (LHSD)
Hydro-Politics in the Mekong basin
Low Hazard Small Dams
Development of National Disaster Management Plan of Vietnam
The Diversion Works for the Cua Dat CFRD in Vietnam
Welcome address to “ASIA 2018” conference in Da Nang – VIETNAM 13-15 March 2018
Au Vietnam, la montée des eaux crée un choc des cultures
Climate change is triggering a migrant crisis in Vietnam
Water and energy planning for a sustainable and secure Mekong basin
Status, challenges and orientations for risk management in disaster prevention and control in Vietnam
The Optimization of the Design of a Concrete Faced Rockfill Dam by the Application of Sand-Gravel Fill Zones
Earthquake: M7.1 Puebla (Mexico) 19‐9‐17
Current Status of Vietnam Coastal Erosion and Major Measures for Mitigation-Case Study: Thanh Hoa Province
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Documents
Send this article

Hydropower development in the lower Mekong basin (LMB)
Over 30,000 MW in LMB (13,000 MW in Lao PDR, 13,000 MW on mainstream and remaining in Cambodia, Viet Nam and Thailand).

In the Mekong Delta (South Vietnam)

HYDROPOWER DEVELOPMENT
IN THE LOWER MEKONG BASIN (LMB)

Dr. Nguyen Duc Lien, Senior Consultant, MRC

                       Dr. Dao Trong Tu, Deputy Secretary General, VNMC

Mekong is one of the world large rivers with Huge Hydropower Potential:

- Over 30,000 MW in LMB (13,000 MW in Lao PDR, 13,000 MW on mainstream and remaining in Cambodia, Viet Nam and Thailand). 

-  Only 7% developed to date and several projects with over 2,000 MW are under construction and/or investigation

-  23,000 MW in Upper Mekong or Lancang River in Yunnan.  About 13% developed and Xiaowan of 4,200 MW is under construction.

 

Please see in much detail (PDF; 614KB) 

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To