Vietnamese
Search Engine

Latest News
The Sambor Dam Is a Tragic Mistake for Cambodia
Kenyan dam bursts causing 'huge destruction' and deaths
Brief on Governance of the Low Hazard Small Dams (LHSD)
Hydro-Politics in the Mekong basin
Low Hazard Small Dams
Development of National Disaster Management Plan of Vietnam
The Diversion Works for the Cua Dat CFRD in Vietnam
Welcome address to “ASIA 2018” conference in Da Nang – VIETNAM 13-15 March 2018
Au Vietnam, la montée des eaux crée un choc des cultures
Climate change is triggering a migrant crisis in Vietnam
Water and energy planning for a sustainable and secure Mekong basin
Status, challenges and orientations for risk management in disaster prevention and control in Vietnam
The Optimization of the Design of a Concrete Faced Rockfill Dam by the Application of Sand-Gravel Fill Zones
Earthquake: M7.1 Puebla (Mexico) 19‐9‐17
Current Status of Vietnam Coastal Erosion and Major Measures for Mitigation-Case Study: Thanh Hoa Province
Rainfall Prediction System for the CuaDat Dam Basin
Climate Change, Water and Hydropower
Some pictures of Asphalt Core Embankment Dams
The advent of Geomembrane Faced Earth and Rock Dams (GFRD)
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Correspondence
Send this article

Geologist for dams sought !!(VERY URGENT!)
Dear Colleagues, I am contacting you on behalf of SOFRECO, a consortium leader of the EU Technical Assistance Facility for Sustainable Energy - Neighbourhood (East and South), Asia (including Central Asia), Latin America, Caribbean and Pacific

Geologist for dams sought !!

(VERY URGENT!)

 

Dear Colleagues,

I am contacting you on behalf of SOFRECO, a consortium leader of the EU Technical Assistance Facility for Sustainable Energy - Neighbourhood (East and South), Asia (including Central Asia), Latin America, Caribbean and Pacific, to see whether you would be interested in the position of Senior International Geologist/Geotechnical Specialist (NKE2 - Cat. 1) on the new assignment in Lao PDR

ToR we have just received from DG DEVCO (The Client) requires 2 Non-Key Experts: Senior International Technical Dam Safety Specialist and Assignment Leader (NKE1/AL, Cat. 1 or 2) (90 working days) and Senior International Geologist/Geotechnical Specialist (NKE2 - Cat. 1 or 2) (61 working days) to act as international advisers to MEM.

The main objective of this assignment is to assist MEM in reviewing the Emergency Dam Safety Inspection Reports and for some cases, the Detailed Dam Safety Evaluation Reports and conducting site visits with MEM, as required, to confirm the safety conditions stated in the Emergency Inspection Reports and Detailed Dam Safety Evaluation Reports.

Please find attached ToR with more details on the assignment and expert profiles. 

Expert profile for Geologist/Geotechnical Specialist is provided below for your convenience. 

The main tasks of Geologist/Geotechnical Specialist would be as follows, but not limited to:

Review the regional/local geological characteristics and seismic conditions of the dams and associated structures;·

Review the analytical results of foundation conditions and material sources including results of borehole excavation, laboratory testing, in-situ tests, etc.;·

Review the designs of foundation treatment, excavation, foundation strength parameters and seepage control and slope protection measures, etc.;·

Review the identified and tested results of construction materials of the dams and associated structures;·

Review testing results, design recommendations and documents detailing the studies conducted;·

Review available construction supervision reports and quality control data regarding construction materials properties, compaction criteria, foundation excavation / treatment, etc.;·

 Review the reservoir rim condition and potential landslides and water seepage if required·

 Review and assess monitoring records of instruments, such as piezometer, seepage, settlement, etc.;·

 Provide inputs to the International Advisors reports in coordination with the Dam Safety Specialist/Chair.·

 

Qualification and Skills

 Master’s Degree or higher geology and/or in civil engineering;·

 Additional degree in any other relevant subjects will be an added advantage.·

General Professional Experience

 At least 20 years of relevant professional experience in the field of the assignment (as a practitioner);·

 Proven excellent report writing and communication skills (oral and written).·

 

Specific Professional Experience

 20 years’ professional experience, particularly in geotechnical investigation, tests, design; and·

 Experience in construction supervision of large hydropower projects with dams and tunnels among its main components; and·

 Should have prior experience serving in expert panels;·

 Experience in South East Asia, and /in Lao PDR would be an advantage.·

Can you please let me know if you could be interested in, and available for this opportunity and if you could then I would kindly ask you to suggest your daily fee rate and fill in the attached EU TAF CV template and send it back to me as soon as you can.

 

Please note that the Key qualifications section of your CV should illustrate how you meet ToR requirements.

 If you are not interested in, or available for this opportunity then I would really appreciate if you could circulate my email with ToR and CV template to potential candidates or provide their contact emails to me.

DG DEVCO requests selected experts to be mobilised before the beginning of January 2019 since the field mission is planned for early January 2019. 

 Therefore I would need to close applications on Monday, 17 December 2018, CoB  and your prompt reply would be very much appreciated.

 Thank you.

 Best regards,

 Majda BUNJEVČEVIĆ

Consortium Deputy Project Director

EU Technical Assistance Facility for Sustainable Energy for Neighborhood (East and South), Asia (incl. Central Asia), Latin America,Caribbean and Pacific

This project is funded by the European Union and implemented by a SOFRECO led consortium

SOFRECO – Project Office

Avenue des arts 24, 1000 Brussels, Belgium

Email:       majda.bunjevcevic@sofreco.com 

Tel:          +32 2 416 17 04

·         Please find documents enclosed!  (TAF ;    CV tempalte)

 

Give your comments 

Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To